
© 2013 Cisco and/or its affiliates. All rights reserved.
BRKCRS-3090
Cisco Public
Smart Install (SI) – Considerations
• The Director must be first L3 hop in-between SI clients and
the DHCP server
• Director Scaling considerations:
• 3K / 4K supports 64 clients
• 6500 supports 32 clients
• ISR supports 36 clients
• No redundancy for the Smart Install Director
17
Komentáře k této Příručce