Cisco uBR7225VXR Specifikace

Procházejte online nebo si stáhněte Specifikace pro Sítě Cisco uBR7225VXR. Cisco uBR7225VXR Specifications Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 20
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
QUICK START GUIDE
Cisco uBR7225VXR Universal Broadband Router
1 Overview
2 Preparing for Installation
3 Installation Guidelines
4 Installing the Chassis
5 Connecting the Chassis to Power
6 Cabling
7 Powering on the Cisco uBR7225VXR Router
8 Troubleshooting the Installation
9 Related Documentation
10 Obtaining Documentation and Submitting a Service Request
1 Overview
The Cisco uBR7225VXR universal broadband router is used in Cisco Cable Modem Termination System
(CMTS) solutions. The router allows high-speed data services to be packaged similar to basic cable
television service or video fare.
The Cisco uBR7225VXR router:
Supports data and packetized voice connectivity over a bidirectional cable television and IP backbone
network.
Supports high-speed Internet access, IP telephony, and Virtual Private Network (VPN) applications.
Supports PacketCable 1.0, Data-over-Cable Service Interface Specification (DOCSIS) 1.1, and
EuroDOCSIS 1.1.
Supports DOCSIS- or EuroDOCSIS-based cable interfaces and cable modems (or set-top boxes with
integrated DOCSIS or EuroDOCSIS cable modems).
Supports DOCSIS 2.0 A-TDMA only.
Zobrazit stránku 0
1 2 3 4 5 6 ... 19 20

Shrnutí obsahu

Strany 1 - 1 Overview

QUICK START GUIDECisco uBR7225VXR Universal Broadband Router1 Overview2 Preparing for Installation3 Installation Guidelines4 Installing the Chassis5 C

Strany 2 - Cisco uBR7225VXR Components

10Step 3 Thread the four M4 x 6-mm Phillips flathead screws through the bracket and into the side of the chassis. Use a number 2 Phillips screwdriver

Strany 3 - 1 2 3 4 5

11Installing the Cable-Management Bracket Before installing the chassis in the rack, both rack-mount brackets and the cable-management bracket must be

Strany 4 - Preparing for Installation

12Installing the Chassis in the RackWarningThis unit is intended for installation in restricted access areas. A restricted access area can be accessed

Strany 5 - Specification Minimum Maximum

13Connecting the Chassis to GroundBefore connecting power and turning on the router, you must provide an adequate ground connection for your system. T

Strany 6 - 3 Installation Guidelines

14To connect the Cisco uBR7225VXR router chassis to ground, complete the following steps:Step 1 Ensure that there is no power going to the router.Step

Strany 7 - Coaxial Cable Connections

15Step 2 Plug the power cable into the AC connector of the power supply.Note For additional AC power cable strain relief, secure the cable to the powe

Strany 8 - 4 Installing the Chassis

167 Powering on the Cisco uBR7225VXR RouterAfter installing your Cisco uBR7225VXR universal broadband router and connecting cables, check the followi

Strany 9

17Identify Startup ProblemsStartup problems are commonly caused by source power problems or a board (network processing engine or cable interface line

Strany 10

18Subscribe to the What’s New in Cisco Product Documentation as a Really Simple Syndication (RSS) feed and set content to be delivered directly to you

Strany 11

Americas HeadquartersCisco Systems, Inc.San Jose, CA Asia Pacific HeadquartersCisco Systems (USA) Pte. Ltd.SingaporeEurope HeadquartersCisco Systems I

Strany 12

2• Supports both 6-MHz North American channel plans using ITU-T J.83 Annex B operation and 8-MHz phase alternating line (PAL) and Sequential Coulour A

Strany 14 - AC Power Supplies

3Figure 1 Front View of the Chassis Figure 2 Rear View of the Chassis1Cable interface card slot 12Cable interface card slot 21Gigabit Ethernet 0/15Con

Strany 15 - 6 Cabling

4Card Slot and Logical Interface NumberingThe cable interface line card slots maintain the same slot number regardless of whether other cable interfac

Strany 16

5Temperature and Humidity RequirementsTable 1 and Table 2 list the nominal operating and non-operating environment requirements. Any measurements that

Strany 17 - 9 Related Documentation

6Installation Tools and EquipmentThe tools and equipment listed below are recommended as the minimum necessary to install the Cisco uBR7225VXR router.

Strany 18

7For details about cabling specifications, refer to the Network Processing Engine and Network Services Engine Installation and Configuration guide at

Strany 19 - Europe Headquarters

8Rack-Mount Installation Guidelines• Allow sufficient clearance around the rack for maintenance.You need 36 in. (91.44 cm) of clearance to remove and

Strany 20

9Attach the Rack-Mount Brackets to the Rear of the ChassisTo install the rack-mount brackets on the chassis for a rear rack-mount configuration, compl

Komentáře k této Příručce

Žádné komentáře