Cisco 1900 series Specifikace

Procházejte online nebo si stáhněte Specifikace pro Sítě Cisco 1900 series. Cisco 1900 series Specifications Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 44
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
CHAPTER
Installation and Startup 2-1
2
Installation and Startup
The following topics in this chapter describe the preinstallation considerations and
installation and startup procedures for the switch:
Preinstallation considerations
Procedures for installing the switch on a table, rack, and wall and powering up the
switch
Procedures for assigning IP information and a password to the switch
Procedures for connecting the switch to other devices
Procedures for accessing the management interfaces
Preparing for Installation
This section covers the following topics:
Warnings and regulatory statements
Site preparation considerations
Contents of the shipping container
Information for verifying that the switch is operational
Zobrazit stránku 0
1 2 3 4 5 6 ... 43 44

Shrnutí obsahu

Strany 1 - Installation and Startup

CHAPTER Installation and Startup 2-12Installation and StartupThe following topics in this chapter describe the preinstallation considerations andinsta

Strany 2 - Warnings

Installing the Switch in a RackCatalyst 1900 Series Installation and Configuration Guide2-10Figure 2-2 Attaching Brackets for 19-, 23-, and 24-inch Ra

Strany 3 - EMC Regulatory Statements

Installation and Startup 2-11Installing the Switch in a RackFigure 2-4 Attaching Brackets for 19-, 23-, and 24-inch Racks (Mid-Mount)Step 3Use the fo

Strany 4 - Preparing for Installation

Installing the Switch in a RackCatalyst 1900 Series Installation and Configuration Guide2-12Step 4 Attach the cable guide and secure the cables in the

Strany 5 - Package Contents

Installation and Startup 2-13Installing the Switch on a WallInstalling the Switch on a WallCaution Before you perform the following steps, be sure th

Strany 6

Installing the Switch on a WallCatalyst 1900 Series Installation and Configuration Guide2-14Figure 2-7 Attaching Brackets for Parallel and Vertical Wa

Strany 7

Installation and Startup 2-15Installing the Switch on a WallStep 3 Attach the switch to a wall. For the best support of the switch and cables, makesu

Strany 8

Connecting to the Console PortCatalyst 1900 Series Installation and Configuration Guide2-16Connecting to the Console PortNote The rollover console cab

Strany 9

Installation and Startup 2-17Connecting to the Console PortStep 2 Connect one end of the supplied rollover console cable to the console port, asshown

Strany 10 - 1x 2x 3x 4x 5x 6x 7x 8x

Powering Up the SwitchCatalyst 1900 Series Installation and Configuration Guide2-18Step 4 Connect the other end of the supplied rollover console cable

Strany 11

Installation and Startup 2-19Assigning IP Information and a Password to the SwitchAssigning IP Information and a Password to the SwitchAfter POST com

Strany 12 - Black Philips machine screw

Preparing for InstallationCatalyst 1900 Series Installation and Configuration Guide2-2WarningsTranslated versions of the following safety warnings are

Strany 13

Assigning IP Information and a Password to the SwitchCatalyst 1900 Series Installation and Configuration Guide2-20Privileged-Level PasswordA privilege

Strany 14

Installation and Startup 2-21Assigning IP Information and a Password to the SwitchTo assign IP information and a password to the switch, follow these

Strany 15

Assigning IP Information and a Password to the SwitchCatalyst 1900 Series Installation and Configuration Guide2-22Step 2 Enter the [I] IP address opti

Strany 16 - • No flow control

Installation and Startup 2-23Connecting to the Switched 10BaseT PortsConnecting to the Switched 10BaseT PortsYou can connect the 10BaseT ports (1x th

Strany 17 - Supplied RJ-45-to-RJ-45

Connecting to the Switched 10BaseT PortsCatalyst 1900 Series Installation and Configuration Guide2-24Figure 2-12 Connecting to a 10BaseT PortStep 2Con

Strany 18 - Powering Up the Switch

Installation and Startup 2-25Connecting to the Switched 100BaseTX PortsConnecting to the Switched 100BaseTX PortsYou can connect the 100BaseTX ports

Strany 19 - IP Information

Connecting to the Switched 100BaseTX PortsCatalyst 1900 Series Installation and Configuration Guide2-26To connect a switch 100BaseTX port to another 1

Strany 20 - Privileged-Level Password

Installation and Startup 2-27Connecting to the Switched 100BaseFX PortConnecting to the Switched 100BaseFX PortWarning Class 1 laser product.Warning

Strany 21 - (Figure 2-10)

Connecting to the Switched 100BaseFX PortCatalyst 1900 Series Installation and Configuration Guide2-28To connect a switch 100BaseFX port to another 10

Strany 22

Installation and Startup 2-29Connecting to the Switched 100-Mbps Fiber-Optic PortsConnecting to the Switched 100-Mbps Fiber-Optic PortsWarning Class

Strany 23

Installation and Startup 2-3EMC Regulatory StatementsWarning This equipment is intended to be grounded. Ensure that the host is connected toearth gro

Strany 24 - (not supplied)

Connecting to the Switched 100-Mbps Fiber-Optic PortsCatalyst 1900 Series Installation and Configuration Guide2-30All fiber-optic connections between t

Strany 25

Installation and Startup 2-31Connecting to the Switched 100-Mbps Fiber-Optic PortsStep 3 Connect the other end of the cable to the SC or ST port of t

Strany 26 - Category 5 cable

Connecting to the Switched AUI PortCatalyst 1900 Series Installation and Configuration Guide2-32Connecting to the Switched AUI PortThe AUI port on the

Strany 27

Installation and Startup 2-33Connecting to the Switched AUI PortFigure 2-16 Connecting to the AUI PortStep 4Connect the other end of the cable to the

Strany 28 - Multimode fiber-optic cable

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-34Accessing the Management InterfacesYou can choose to u

Strany 29

Installation and Startup 2-35Accessing the Switch ManagerConfiguring Netscape Communicator 4.5, 4.51, or 4.61Note Netscape Communicator 4.60 is not a

Strany 30 - 100BaseFX

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-36Step 5 In the Internet Options window, click Security.

Strany 31

Installation and Startup 2-37Accessing the Switch ManagerConfiguring Microsoft Internet Explorer 5.0Note During the installation of this browser, make

Strany 32

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-38Step 9 Click Custom.This enables the Java Custom Setti

Strany 33

Installation and Startup 2-39Accessing the Switch ManagerTo display the switch manager, follow these steps:Step 1 As in the following illustration, e

Strany 34

Preparing for InstallationCatalyst 1900 Series Installation and Configuration Guide2-4Site PreparationWhen determining where to place the switch, ensu

Strany 35

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-40Step 2 Enter the switch password or, if the switch is

Strany 36

Installation and Startup 2-41Accessing the Management Console and CLIContinue to configure or monitor the switch from the switch manager, as described

Strany 37

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-42Figure 2-18 Management Console Logon ScreenCatalyst 19

Strany 38 - Displaying the Switch Manager

Installation and Startup 2-43Accessing the Management Console and CLIStep 4 Enter the switch password or, if applicable, the command-switch password

Strany 39 - Accessing the Switch Manager

Accessing the Management InterfacesCatalyst 1900 Series Installation and Configuration Guide2-44Accessing MIB FilesYou can access the switch MIB files

Strany 40 - 10.1.126.35

Installation and Startup 2-5Package ContentsPackage ContentsNote Carefully remove the contents from the shipping container, and check each item forda

Strany 41

Preparing for InstallationCatalyst 1900 Series Installation and Configuration Guide2-6Powering Up and Using POST to Test the SwitchBefore installing a

Strany 42

Installation and Startup 2-7Installing the Switch on a Table or Shelf• Fatal failure(s) detected—POST completes all tests, even after detecting a fat

Strany 43

Installing the Switch in a RackCatalyst 1900 Series Installation and Configuration Guide2-8Installing the Switch in a RackThe rack-mounting brackets s

Strany 44 - Accessing MIB Files

Installation and Startup 2-9Installing the Switch in a RackCaution Before you perform the following steps, be sure the switch is powered off and isno

Komentáře k této Příručce

Žádné komentáře