Cisco CX-FEIP-1TX= Installation and con?guration Uživatelská příručka Strana 375

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 648
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 374
PTP 800 Series User Guide Installing the IF and ground cables
phn-2513_004v000 (Oct 2012)
5-53
To install and ground the main IF cable, proceed as follows:
1
Attach the N type connector at the top end of the main IF cable to the SURGE
port of the top LPU.
2
Protect the N type connectors on the LPU from the weather by applying self-
amalgamating and PVC tape, as described in Weatherproofing an N type
connector on page 5-45.
3
Lay the main IF cable as far as the building entry point, ensuring there is enough
length to extend through the wall of the building to the bottom LPU.
4
Attach the main IF cable to the supporting structure using the cable ties
provided.
5
Ground the IF cable at the points specified in Protection requirements for a mast
or tower installation on page 2-11.
Follow the procedure Making an IF cable ground point on page 5-54.
Zobrazit stránku 374
1 2 ... 370 371 372 373 374 375 376 377 378 379 380 ... 647 648

Komentáře k této Příručce

Žádné komentáře