Cisco DDR2200 Series Uživatelský manuál Strana 12

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 41
  • Tabulka s obsahem
  • ŘEŠENÍ PROBLÉMŮ
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 11
Method and Procedure
Field Operations Support MP-2009-08-002/ Issue 10 / Date: 11-01-10
Process Owner: Centralized Operations - Field Operations Support
Information contained in this document is proprietary
Unauthorized disclosure outside CenturyLink Corporation is prohibited
12
3 Select the speed on the customer’s account/order
FHSB015 – 15/1.5
FHSB20M – 20/2.0
FHSB25M – 25/2.0
4 Press OK and allow the script to run. It will test the physical line statistics of Pair 1;
Sync Rate
Noise Margin
Attenuation
5 A Summary Screen will appear recapping which portions of the test on Pair 1 passed or failed.
Click OK
6 The test set will prompt you to connect Pair 2
7 Connect DSL Pair 2 to the DSL Line Port on the side of the test unit
Zobrazit stránku 11
1 2 ... 7 8 9 10 11 12 13 14 15 16 17 ... 40 41

Komentáře k této Příručce

Žádné komentáře