Cisco TOPSPIN SFS 3001 Uživatelský manuál

Procházejte online nebo si stáhněte Uživatelský manuál pro Počítače Cisco TOPSPIN SFS 3001. Cisco TOPSPIN SFS 3001 User Manual Uživatelská příručka

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 30
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 0
Cisco SFS 3001 Multifabric Server Switch
Quick Start Guide (Topspin 90 Quick Start Guide)
Release 2.1.0
Part Number: OL-7712-01
Product ID: 140252
Zobrazit stránku 0
1 2 3 4 5 6 ... 29 30

Shrnutí obsahu

Strany 1 - Release 2.1.0

Cisco SFS 3001 Multifabric Server Switch Quick Start Guide (Topspin 90 Quick Start Guide)Release 2.1.0Part Number: OL-7712-01Product ID: 140252

Strany 2

25. Prepare the physical environment for the Topspin 90. a. Make sure that you have an approved grounding wrist-strap. b. Make sure the system has the

Strany 3 - Contents

31. Take one connected pair of rack brackets and separate them. Each side arrives assembled to its counterpart, but should be separated before attachi

Strany 4

45. Attach the remaining two rail brackets to your rack. a. Orient a bracket toward the back of the rack with the flange facing away from the rack. Th

Strany 5 - Regulatory Notices

5If the brackets do not slide easily, the alignment may be off. Pull the switch back toward you and realign the brackets. Figure 1-5: Sliding the Swit

Strany 6

6Connect InfiniBand Cables1. Plug InfiniBand Cables from the InfiniBand-enabled host to the InfiniBand switch ports. This can also be done in a later

Strany 7 - Laser Cautions

7c. Enter the enable command.d. Enter the configure command.e. Enter the interface mgmt-ethernet command.f. Enter the IP address of the management por

Strany 8 - Contact Information

8f. Enter the option dhcp command. The chosen method will be persistent across module reboots.g. Enable the management port by entering the no shutdow

Strany 9 - Topspin 90 Quick Start

9d. Open a terminal or graphic window and access the top-level directory on the CD-ROMe. Execute the command ./tsinstall in a terminal window. This pr

Strany 10 - Rack Mount Installation

105. Plug InfiniBand Cables from the host to the InfiniBand switch. a. To plug in an InfiniBand cable, push the connector into the interface until you

Strany 11

11• 300 Mhz processor• 800x600 screen resolution, 16bit color depth2. Insert the Topspin CD-ROM into the CD-ROM drive of a server that has network acc

Strany 12

Copyright © 2003-2004 Topspin Communications, Inc. All rights reserved.The Topspin Switched Computing System, Topspin Host Channel Adapter, Topspin El

Strany 13 - Cable the Switch

124. Chassis Manager loads in your browser window.Figure 1-10: Chassis Manager Opening Display for the Topspin 90 Server SwitchConfigure Additional Se

Strany 14 - Configure Basic Connectivity

13• In the CLI, enter the configuration mode and enter the ntp command with the IP address of the NTP server. Example3. Configure administrators and p

Strany 15

14Use the broadcast-forwarding command.Exampleor If you are not using DHCP, configure the next InfiniBand hop. Use the ib-next-hop command.Example4. S

Strany 16

15Configure the Fibre Channel Gateway (Optional)To configure ITLs, perform the following steps:1. Log in to your host.2. Enter the /etc/init.d/ts_srp

Strany 17 - Example of Two HCAs

16advantage of CLI options to assign these values dynamically. The remainder of this process dynamically allocates WWNNs and WWPNs.The auto-bind keywo

Strany 18

178. (Optional) Enter the show fc srp initiator command to verify the new initiator.Example9. Enter the fc srp initiator command with• the GUID of the

Strany 19 - Launch Chassis Manager

18NOTE: This command may take some time to execute.Example10. Enter the show fc srp itl command to display the potential ITLs and record the target-ww

Strany 20 - Configure Additional Settings

19NOTE: The fc-lunid field displays the LUN ID of the ITL that you will configure. For non-sequential LUNs, this value will always appear as 00:00:00:

Strany 21 - Layer 2 Bridging Procedure

2015. Return to User Exec mode or Privileged Exec mode and enter the show fc srp itl command to verify that the ITL is active. Port numbers appear in

Strany 22

IndexBbasic connectivity ...6Cchassis managerlaunching ...

Strany 23

iiiContentsRegulatory Notices... vFCC Statement...

Strany 25

ivLaunch Chassis Manager ...11

Strany 26

vRegulatory NoticesFCC StatementThis equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to Part 15 o

Strany 27

viEnsure the ground connection on the power supply is correct and functioning before applying power to the Topspin system. CAUTION: Always ground your

Strany 28

viiCAUTION: Never place your hand inside an empty card or module bay. You should never have cause to place a hand anywhere inside the Topspin chassis.

Strany 29

viiiLaser SpecsContact InformationTable III-1: Topspin P/N Application Optical Parameters48-00001-01 Fibre Channel *CDRH/IEC Laser Class: 1/1Maximum D

Strany 30

11Topspin 90 Quick Start This document describes the basic steps required to install and configure the Topspin 90 system.For more detailed information

Komentáře k této Příručce

Žádné komentáře