Cisco MGX 8230 Specifikace Strana 130

  • Stažení
  • Přidat do mých příruček
  • Tisk
  • Strana
    / 282
  • Tabulka s obsahem
  • KNIHY
  • Hodnocené. / 5. Na základě hodnocení zákazníků
Zobrazit stránku 129
3-22
Cisco MGX 8230 Edge Concentrator Installation and Configuration
Release 1.1.31, Part Number 78-11215-03 Rev. B0, May 2001
Chapter 3 Site Preparation
Power and Grounding
The Cisco-supplied cabinet has two pairs of grounding studs and the hardware for securing a ground
conductor to the studs at the top and bottom of the cabinet. The studs measure 1/4" by 20 threads per
inch. The studs can accept the two-holed grounding connector designed to prevent rotation and possible
loosening of the connector. Figure 3-4 shows the Cisco cabinet with the ground attachment studs in the
upper and lower parts of the cabinet. A ground symbol on the Cisco rack indicates the points of
attachment.
Making Cisco Cabinet Ground Connections
Cisco recommends the following steps for attaching a ground conductor to the frame of a Cisco rack:
Step 1 Place an external, toothed star washer onto the stud.
Step 2 Place the connector terminating the grounding conductor closed-loop ring or two-hole compression
fitting onto the stud.
Step 3 Place another external, toothed star washer or lock washer onto the stud.
Step 4 Screw a nut onto the threaded stud.
Zobrazit stránku 129
1 2 ... 125 126 127 128 129 130 131 132 133 134 135 ... 281 282

Komentáře k této Příručce

Žádné komentáře